-
Reduction of setup interruptions
Markus SpinnerDone
-
Factory tour
Done
-
Arrival, Networking and Coffee reception
Done
-
Reduction of setup interruptions
Done
-
Preparation of the presentations / drive to factory 1
Done
-
Lunch and group photo
Done
-
Welcome and Introduction of agenda
Georg WasserloosDone
-
Joint dinner incl. shuttle service
Done
-
Introduction of company group fischer and fischer process system (fPS)
Markus SpinnerDone
-
Summary and outlook for the 2nd day
Georg WasserloosDone
Reduction of setup interruptions
Location: Workshop 3
-
12/02/2019, 07:30
-
12/02/2019, 12:00
(Eastern Standard Time)
(4 hours 30 minutes)
Markus Spinner
Senior Projektmanager
at fischer Consulting GmbH
markus.spinner@fischer.consulting
+49 7443 124730