-
End of the 1st training day
Done
-
Integration into the project plan - what does this look like?
Thormod SigleDone
-
From Manufacturing Execution System (MES) to Smart Manufacturing Operation Management (MOM)
Michael OberleDone
-
Operating system for the production of the future
Daniel SchelDone
-
I 4.0 implementations in Bosch plants
Efe Kutluhan KaplanDone
-
Lunch break
Done
-
Introduction to the 2nd day
Paul ThiemeDone
-
Coffee break
Done
-
Coffee break
Done
-
Guided tour through the Future Work Lab
Henry HimmelstoßDone
Asset Administration Shell: What does the new standard promise for the industry?
12/06/2024, 04:15
-
12/06/2024, 05:00
(Eastern Daylight Time)
(45 minutes)
Olga Meyer
Interoperabilität für die digitale Produktion
at Fraunhofer IPA
olga.meyer@ipa.fraunhofer.de
+49 711 9701068