-
Business game - From Lean to Industry 4.0
Ozan Yesilyurt , Henry HimmelstoßDone
-
Introduction to Industry 4.0
Dr. Paul ThiemeDone
-
Coffee break
Done
-
Connectivity in I 4.0
Frank MarkertDone
-
End of the 1st training day
Done
-
Integration into the project plan - what does this look like?
Thormod SigleDone
-
Welcome Day 1 at Bosch in Stuttgart
Nicole MössDone
-
Model Factory Tour incl. Discovery Area
Done
-
Introduction to the 2nd day
Dr. Paul ThiemeDone
-
From Manufacturing Execution System (MES) to Smart Manufacturing Operation Management (MOM)
Michael OberleDone
5G in production
12/06/2024, 08:30
-
12/06/2024, 09:00
(Eastern Daylight Time)
(30 minutes)
Fabian Haag
Projektleiter Transferzentrum 5G4KMU
at Fraunhofer IPA