-
Practical report "Digitization in the production of Maschinenfabrik Reinhausen
Sebastian LorenzDone
-
Practical report "Digitization in the production of Maschinenfabrik Reinhausen
Done
-
Lunch
Done
-
Practical report "Digitization in the production of Maschinenfabrik Reinhausen
Michael WagnerDone
-
Arrival & Networking
Done
-
Practical report "Digitization in the production of Maschinenfabrik Reinhausen
Johann HofmannDone
-
Presentation of the six application levels of the target concept
Done
-
Practical report "Digitization in the production of Maschinenfabrik Reinhausen
Done
-
Practical report "Digitization in the production of Maschinenfabrik Reinhausen
Done
-
Development of target concept - Phase 1: Application of the 635 method
Done
Groupwork
29/07/2020, 07:15
-
29/07/2020, 08:15
(Eastern Daylight Time)
(1 hour)
Betrachten der Punkte:
• Chancen / Risiken
• Klärungen die wichtig sind
• Quick -wins
• Erste Schritte
• Ableiten einer Sofortliste